8 lines
778 B
Markdown
8 lines
778 B
Markdown
3 on ethics/confusion, kill feature. Every Monday morning, the PM runs a 10-minute “Muhāsaba check” — compare actual quadrant performance vs. predicted. If any quadrant drops below threshold, initiate rollback immediately.
|
||
|
||
---
|
||
|
||
## MUHĀSABA (RETROSPECTIVE)
|
||
|
||
**Where did we let “Feasible” override “Viable” this sprint, and what wealth did that cost us?**
|
||
Force yourself to name one feature that was easy to build but ethically uncertain. Write down the exact dollar amount of engineering hours spent, plus the hidden cost of user trust lost. If you can’t find a single example, you haven’t been honest. The MVP Quadrant is not a rubber stamp — it’s a mirror. Look until you see the waste you chose to ignore. Then adjust your Shurūṭ for next sprint. |