Initial build: Horizon 1 Prevention Suite + Horizon 2 Unlock demo
Svelte 5 + Vite PWA, styled to match moslem03.falahos.my's design system. Horizon 1: Faraid Calculator (shared calc core, 14 classical cases passing), Asset Registry, Wassiyah Generator (1/3 meter + heir-exclusion block), Hibah Tracker and Family Waqf Designator (shared marad al-mawt guardrail). Horizon 2: Digital Beneficial Claims — local non-custodial demo of the claim model and transfer restriction only. Two governance gates in this project's own PRDs were overridden per explicit product direction, and are flagged in-app and in README.md / deploy/DEPLOY.md rather than silently shipped as production-ready: - Family Waqf Designator ships ahead of scholarly sign-off (OPEN-01 in scholarly-review-log.md remains unresolved). - Horizon 2 ships ahead of the PRD's stated Phase 0 gate (legal opinion + signed institutional partner) with no confirmation that gate is cleared.
This commit is contained in:
Binary file not shown.
|
After Width: | Height: | Size: 4.1 KiB |
Reference in New Issue
Block a user